Camarillo Sanitary District/Camrosa Water District Sewer Projects

City of Camarillo/Camrosa Water District Conejo Creek Flow Diversion Structure and Sewerlines Project

$1.53 MILLION - OCTOBER 2000
DESIGN AND INSPECTION SERVICES
CONTRACTOR: APPLE VALLEY CONSTRUCTION, DOUGLAS HAMILTON

Construction of Combined Sewer Flow Control/Diversion Box

THE PROJECT INVOLVED THE CONSTRUCTION OF TWO SEPARATE PARALLEL SEWER PIPELINES,( 1 C905 PVC/HDPE and 1 CLAY) WITH ASSOCIATED MANHOLES AND FLOW CONTROL SPLITTER STRUCTURE TO REPLACE A DEGRADED CONCRETE COMMON SEWER PIPELINE SHARED BY THE CAMROSA WATER DISTRICT AND THE CAMARILLO SANITARY DISTRICT .

 

  Construction of 36 Inch C905 (Blue Brute) PVC Sewer Pipe and Concrete Manholes
HIGH DENSITY POLYETHYLENE (HDPE) PIPELINE SLIPPED THROUGH STEEL CASING. PIPE WAS DELIVERED IN SECTIONS AND BUTT FUSED IN THE FIELD
  Click the image you would like to see enlarged.
Construction of 36 Inch HDPE Sewer Pipe Pulled Through Steel Casing Under CA Highway 101

CONCRETE FLOW SPLITTER STRUCTURE WITH "AMERON BRAND" T-LOCK PVC LINER FOR CORROSION PROTECTION
  Click the image you would like to see enlarged.
 
THE CONCRETE FLOW SPLITTER STRUCTURE DESIGN INCORPORATED A REMOVABLE LID FOR FUTURE MAINTENANCE

Construction of Combined Sewer Flow Control/Diversion Box Reinforcement and Corrosion Protection Elements


2505 30TH STREET SANTA MONICA, CA 90405
PHONE (310) 392-3137 FAX (310) 392-3124 CELL NO. (310) 864-2157
E-MAIL:
watsoncm@earthlink.net
©2000-2010 Watson Consulting Engineers Inc. All Rights Reserved.