Construction of the new sewer diversion structure. Note: installation of the PVC
"T-Lock ®" brand protective corrosion liner, installed before placing the concrete.
Steel reinforcement bond beams for the concrete lid are constructed to allow for
future lifting of the lid structure. Also note forming for the hatches, slide gates
gas/air vent and access ladder.