Watson Consulting Engineers Inc. has 20 years of experience in design, project management and construction inspection of pump stations, pipelines, storm drain systems, flow control structures and wastewater facilities.  Watson Consulting Engineers has an additional 9 years experience working for the Pennsylvania Department of Transportation and for private contractors.

Project Management and Construction Inspection

As resident engineer, Watson Consulting Engineers (WCE) has supervised onsite project construction management services.  Duties have included all facets of services required to monitor construction activities, provide design overview, and facilitate the successful completion of the project.  Specific duties have been to preside over progress meetings and to document specific actions, to quantify construction activities relative to pay requests, coordinate Request For Information (RFIs), resolve/negotiate contractor's request for change in conditions (Change Orders), and keep the owner informed of project issues.  Other resident engineering duties include facilitating shop drawing reviews and design issues with the engineer.  We have been responsible for managing civil, mechanical, electrical, instrumentation, and specialty inspectors to provide a high degree of documentation and monitor quality of workmanship of the contractor's work.  WCE's participation has been instrumental in the success of several of the projects shown on this web site.

Wastewater Treatment Facility Design and Sewerline Design

  • Designed and wrote specifications for the $3.63 million City of Exeter Wastewater Treatment Facility Expansion project. Treatment included design of all the processes: oxidation ditch, headworks, splitter structure, mixed-liquor lift station sodium hypochlorite system, sludge beds, emergency generator and admin building.  Prepared the hydraulic profile, and engineers cost estimate.
  • Designed and wrote specifications for the $7 million City of Delano, California Sewer Trunk Main Project which included the jacking and boring of VCP under State highways and railway lines.
  • Design of a 0.25-million-gallon anaerobic digester with boiler, sludge grinder, SHE unit and pump mix systems for the California State Men's Colony at San Luis Obispo, California.
  • Upgrade and redesign of the City of Wasco, California Wastewater Treatment Facility project, retrofitting the existing digester and gas systems. Responsible for the preparation of cost estimates and alternative construction/cost studies on these projects.

2505 30TH STREET SANTA MONICA, CA 90405
PHONE (310) 392-3137 FAX (310) 392-3124 CELL NO. (310) 864-2157
E-MAIL:
watsoncm@earthlink.net
© 2000-2011 Watson Consulting Engineers Inc. All Rights Reserved. Last Updated April 01, 2011