Project 1 - Conejo Creek Diversion System Piping Project

$2.93 MILLION - NOVEMBER 2000
DESIGN AND INSPECTION SERVICES
CONTRACTOR: TURF CONSTRUCTION, DAVE PYBRUM

PROVIDED CONSTRUCTION SUPPORT SERVICES AND SOME INSPECTION

THE PROJECT INVOLVED THE CONSTRUCTION OF A DUAL SET OF 30 INCH RECYCLED WATER AND RECLAIMED WATER FORCE-MAINS TO TRANSPORT WATER THOUGH VARIOUS LOCATIONS WITHIN VENTURA COUNTY.

THE PROJECT INVOLVED CROSSING THE CONEJO CREEK AT MULTIPLE LOCATIONS.

THE PIPE MATERIALS WERE PRE-PURCHASED BY THE DISTRICT PRIOR TO CONSTRUCTION OF THE PIPELINE.

 

 

Excavation across Conejo Creek, creek flow diverted during construction. Work involved the construction of dual 30" transmission pipelines to transport reclaimed and recycled waters.

Pre-purchased pipe. Manufacture of Pipe at Ameron for Owner.

Project 2 - Conejo Creek Diversion
System Piping

PROVIDED INSPECTION AT AMERON PLANT DURING FABRICATION

40,000 LINEAR FEET CEMENT MORTAR LINED AND COATED STEEL PIPE
COST: $1.8 MILLION - AUGUST 2000
INSPECTION SERVICES DURING PIPE MANUFACTURER
FABRICATOR: AMERON INTERNATIONAL, LEROY KUZEL


2505 30TH STREET SANTA MONICA, CA 90405
PHONE (310) 392-3137 FAX (310) 392-3124 CELL NO. (310) 864-2157
E-MAIL:
watsoncm@earthlink.net
©2000-2010 Watson Consulting Engineers Inc. All Rights Reserved.