CALIFORNIA MEN’S COLONY 1997
DIGESTER REPLACEMENT PROJECT
DESIGN & CONSTRUCTION SERVICES
COST: $1.0 MILLION - JUNE 1997
CONTRACTOR: STATE OF CA
Designed a $1.0 million 0.25-million-gallon anaerobic
digester with boiler, sludge grinder, spiral heat exchanger (SHE) unit and pump
mix systems.
|
Construction of the concrete anaerobic digester
with mixing and gas systems. |
|
Construction of the
concrete digester structure. Note wall forms. |
|
Construction of the
concrete anaerobic wastewater digester structure. Note the rebar and
access manway. |
|
Construction of the
concrete anaerobic wastewater digester structure. Walls are complete and
scaffold in place for roof access. |